Daily moisture log: what to record
Each day: temperature and RH outside, in an unaffected area, in each affected chamber and at each dehumidifier exhaust; the equipment on site; a moisture reading for every monitoring point with its dry standard; and photos of the setup.
Day 1
- Source, time of loss, time of arrival, category and class.
- Room dimensions and wet areas (floor, wall above 2 ft, ceiling), offsets.
- Dry standard per material, monitoring points marked on the sketch.
- Equipment placed with the rated capacity of each dehumidifier.
Every visit
- Four air readings: outside, unaffected, affected, dehumidifier exhaust.
- All monitoring points, same meter and scale.
- Equipment count after adjustments.
- Notes: what changed and why.
Last day
Final readings showing every point at or below goal, equipment removed, and photos of the dry areas.
In the Drypol account the daily form is built for phones: points carry over from the day before, the technician only types the new values.
Section numbers differ between editions of ANSI/IICRC S500, so this guide names the topic. Your copy of the current edition and your own professional judgment are the reference. This guide is general information, not legal advice. IICRC is a registered trademark of the Institute of Inspection, Cleaning and Restoration Certification. ANSI/IICRC S500 is the IICRC Standard for Professional Water Damage Restoration. Drypol is not affiliated with or endorsed by the IICRC; we cite the standard by topic and do not reproduce it.
Sources
- IICRC – ANSI/IICRC S500 Standard for Professional Water Damage Restoration (purchase from the IICRC)
Let us document it for every job
Drypol Unlimited: equipment calculation, drying log, justification and scope – $1,000 a month, unlimited, 3 test cases free.
Related
- Drying Log Service
- Mitigation Documentation Service
- Water Damage Categories 1, 2 and 3 Explained
- Classes of Water Damage
- How Many Air Movers per Room? Air Mover Calculation
- Dehumidifier Calculation
- Grains per Pound
- Drying Goal and Dry Standard
- How to Justify Equipment Days on a Mitigation Job
- Flood Cuts and Removal Decisions in Water Mitigation